Small Cell Acquisition Consultation
- Pre-construction site meetings with utility companies
- Small Cell Site Verification on Distribution Systems (concrete, metal, and/or wood poles), both overhead and underground
- Right of way issues - Land Survey and Title; Soil Testing; other Environmental concerns, etc.
- Joint Pole Authorization (JPA); review of Forms 2, 7, and 48
- Preliminary Site AutoCAD Designs/Drawings
- Identifying added construction costs and/or scheduling delays
- Permitting and Traffic Control Site Plans